Custom cabinetry from our shop, in-house electrical and plumbing, one team carrying every trade. Most kitchens take 8–12 weeks on site.
Clairemont, CA · 2023Kitchen-only scope: layout and design, custom cabinetry, counters, full appliance package, all electrical (new circuits, lighting, under-cabinet) and plumbing (gas relocation, dishwasher, refrigerator water). Permitted, inspected, and warrantied.
Layout sketches, cabinetry design, and a finish board. Most kitchens land selections in 3–5 weeks.
Permit pulled in parallel with cabinet build in our shop. Lead time on cabinets is the long pole, around 6–10 weeks.
Demo, rough plumbing and electrical, drywall, cabinetry install, counters, appliances, finish. Typically 8–12 weeks on site.
Design and selections: 4–6 weeks. Cabinet build (custom): 6–10 weeks, in parallel with permit. On-site construction: 8–12 weeks. Total project from kickoff to final inspection: roughly 4–6 months.
Most full kitchen remodels we take on land between $80,000 and $180,000. Cabinet style and box count, appliance package, counter material, and how much electrical and plumbing relocation is needed all push the number around. We give a real number after a site walk.
Yes. Custom cabinetry is built in our shop. Door style, box construction, drawer hardware, and finish are all spec'd to the project, not to a stock catalog.
Yes. Most clients do. We set up a temporary kitchen (sink, microwave, fridge), seal off the work zone with plastic, and run a daily clean.
Always. Kitchens trigger electrical, plumbing, and sometimes gas permits. We file, post, and close out everything with the city.