The 600
Compact one-bed with an efficient footprint.
- 1 bed
- 1 bath
Detached ADUs to 1,200 sf, attached ADUs, and junior ADUs (JADUs) to 500 sf. We handle California ADU code, setbacks, parking exemptions, and utility connections in-house.
Get an estimate
A free 30-minute consult to scope your estimate.
We start with a feasibility memo (lot, zoning, setbacks, easements, utilities). Then schematic design, construction documents, structural engineering, plan check, and construction. ADUs typically run 6–10 months from groundbreak under California's streamlined ADU process.
Six starting points, one photo each. Open any model for its floor plan, interiors, and dimensioned drawings.
Compact one-bed with an efficient footprint.
One-bed with a generous living room and walk-in shower.
Roomier one-bed with a flexible great room.
Two-bed, two-bath family layout.
Two-bed plan with an open living area and generous covered deck.
Two-bed, two-bath with a large great room.
If a standard footprint does not fit the site or the way you want to live, we will shape one around both. Then we carry it through engineering, permits, and construction.
Plan a custom ADUWe pull lot data, check zoning and HOA, and confirm what your lot allows under state and local ADU code. One-page memo with a preliminary unit size and budget range.
Schematic through CDs, structural engineering, Title 24 energy, and plan check. California's mandated 60-day ADU review keeps this predictable.
Foundation, framing, MEP, finish. Typical detached ADU is 6–10 months on site. Two-year warranty plus ten-year follow-up check-in.
Detached ADUs: up to 1,200 sf statewide. JADUs (junior ADUs, within the existing home footprint): up to 500 sf with a separate entrance and an efficiency kitchen. Local cities can allow more. San Diego allows two ADUs on most single-family lots.
Feasibility and design: 2–4 months. Permit: 60 days statewide max for ADU plan check. Construction: 6–10 months for a detached ADU on a typical lot. Total from kickoff: roughly 11–17 months.
Every ADU is priced after feasibility. Size, finish level, site conditions, utility runs, and service requirements all shape the scope. We review those with you first, then give a project-specific proposal instead of a one-size-fits-all number.
Often no. California exempts ADUs from on-site parking if the lot is within half a mile of public transit, in a historic district, or part of an existing structure conversion. We check this in feasibility.
Depends on the city. San Diego currently restricts short-term rentals on ADUs in most zones. Long-term rental (30+ days) is allowed everywhere ADUs are. We flag the local rule during feasibility.
San Diego County, Orange County, and Los Angeles County. Recent ADU work in Del Mar, Costa Mesa, and across San Diego.