Apex Works is a California design and build firm. We take on ground-up custom homes, whole-home remodels, additions, and ADUs across the state. Kitchens and baths are handled by the same crews. Architecture, permits, electrical, and plumbing all happen in-house.
Yes. We take a project from the empty lot to the final walkthrough: lot due diligence, architecture, structural and civil engineering, permits, and full construction under one license. A scrape-and-rebuild on an established lot is a common path too.
We take projects across California. Completed case studies cover seven San Diego County communities. Our San Diego, Orange County, and Los Angeles pages also show active work in Mission Hills, Solana Beach, Costa Mesa, and Manhattan Beach with its current project phase.
Ground-up custom homes run 18–26 months from first meeting to move-in. Whole-home remodels run 8–14 months. Rear additions run 8–12 months. Detached ADUs typically need 6–10 months of construction, with a planning allowance of roughly 11–17 months from kickoff including design and permitting. Kitchens run 8–12 weeks and primary baths 5–8 weeks. Timelines depend on the scope and the local jurisdiction's permitting timeline.
Yes. Our standard ADU models range from 600 to 1,200 square feet, with final size subject to the applicable state and local rules. We also work on junior ADUs (JADUs) up to 500 square feet. We handle California ADU code compliance, setbacks, parking exemptions, and utility connections in-house.
Yes. CSLB #1144953, fully insured. Because architecture, electrical, and plumbing all live under one license, you aren't coordinating three different companies who never met.
Two-year workmanship warranty on all construction, plus a ten-year follow-up check-in to inspect settling, finishes, and systems.
Use the contact form, email support@meetapx.com, or call +1 (858) 477-5888. Start with a free 30-minute consultation. We use it to understand the home and the program before we quote anything.
Something else? Ask us directly →