New waterproofing, real tile work, and a quiet finish language. Most primary baths run 5–8 weeks on site.
Get an estimate
A free 30-minute consult to scope your estimate.
Bath-only scope: layout and design, demolition, framing changes, full waterproofing, tile, vanity, plumbing fixtures, lighting, ventilation, and trim. We do the wet trades in-house, so the crew you met on day one finishes the shower on day forty.
Layout, fixture schedule, and a tile + finish board. Selections usually finalize in 2–4 weeks.
Permit pulled in parallel with material lead times. Imported tile and slab vanities have the longest lead.
Demo, framing, plumbing rough, electrical rough, waterproofing, tile, drywall, cabinetry, fixtures. 5–8 weeks on a primary bath.
Primary bath: 5–8 weeks on site. Guest bath: 4–6 weeks. Total project from design start to final inspection: roughly 3–5 months.
Most primary bath remodels land between $40,000 and $90,000, depending on tile selection, vanity type, shower complexity, and layout changes. Guest baths usually run $25,000 to $55,000.
Yes. Curbless (zero-threshold) showers are a common request. They need recessed framing, a sloped pan, and the right waterproofing system. We have done dozens.
Guest bath: yes. Only bathroom in the house: usually no, or you plan around contractor hours. A primary bath remodel with another working bath in the house is typically fine.
Sheet membrane (Schluter Kerdi or equivalent) on shower walls and floors, with sealed joints and corners. Code requires a 24-hour flood test before tile. We do it.