New waterproofing, real tile work, and a quiet finish language. Most primary baths run 5–8 weeks on site.
Bath-only scope: layout and design, demolition, framing changes, full waterproofing, tile, vanity, plumbing fixtures, lighting, ventilation, and trim. We do the wet trades in-house, so the same crew you met on day one is finishing the shower on day forty.
Layout, fixture schedule, and a tile + finish board. Selections usually finalize in 2–4 weeks.
Permit pulled in parallel with material lead times. Imported tile and slab vanities have the longest lead.
Demo, framing, plumbing rough, electrical rough, waterproofing, tile, drywall, cabinetry, fixtures. 5–8 weeks on a primary bath.
Primary bath: 5–8 weeks on site. Guest bath: 4–6 weeks. Total project from design start to final inspection: roughly 3–5 months.
Most primary bath remodels land between $40,000 and $90,000 depending on tile selection, vanity type, shower complexity, and any layout changes. Guest baths usually run $25,000 to $55,000.
Yes. Curbless (zero-threshold) showers are a common request. They need recessed framing, a sloped pan, and the right waterproofing system. We've done dozens.
If it's a guest bath: yes. If it's the only bathroom in the house: usually no, or you'll plan around contractor hours. Primary bath remodels with another working bath in the house are typically fine.
Sheet membrane (Schluter Kerdi or equivalent) on shower walls and floors, with sealed joints and corners. Code requires a 24-hour flood test before tile. We do it.