Bath remodel

The bath,
taken back to studs.

New waterproofing, real tile work, and a quiet finish language. Most primary baths run 5–8 weeks on site.

  • CSLB #1144953
  • 4.9★ rating
  • Licensed & Insured
  • Same-day reply
Free estimate

Get your free estimate

A free 30-minute consult to scope your estimate. Same-day reply.

Project type
We reply the same day.
Prefer to talk? Call +1 (858) 667-0800
  • CSLB #1144953
  • 4.9★ rating
  • Licensed & Insured
  • Same-day reply
Encinitas Primary Bath — Bath renovation in Encinitas, CA (2023) by Apex WorksEncinitas, CA · 2023
What it includes

Tile, plumbing, light, all done by the same crew.

Bath-only scope: layout and design, demolition, framing changes, full waterproofing, tile, vanity, plumbing fixtures, lighting, ventilation, and trim. We do the wet trades in-house, so the same crew you met on day one is finishing the shower on day forty.

Start a conversation +1 (858) 667-0800
How we work

One team, beginning to end.

01
Design + selections

Layout, fixture schedule, and a tile + finish board. Selections usually finalize in 2–4 weeks.

02
Permit + procurement

Permit pulled in parallel with material lead times. Imported tile and slab vanities have the longest lead.

03
Build

Demo, framing, plumbing rough, electrical rough, waterproofing, tile, drywall, cabinetry, fixtures. 5–8 weeks on a primary bath.

Selected work

Recent homes.

See all
Frequently asked

Common questions.

How long does a bathroom remodel take?+

Primary bath: 5–8 weeks on site. Guest bath: 4–6 weeks. Total project from design start to final inspection: roughly 3–5 months.

What does a bathroom remodel cost?+

Most primary bath remodels land between $40,000 and $90,000 depending on tile selection, vanity type, shower complexity, and any layout changes. Guest baths usually run $25,000 to $55,000.

Do you do curbless showers?+

Yes. Curbless (zero-threshold) showers are a common request. They need recessed framing, a sloped pan, and the right waterproofing system. We've done dozens.

Can we live at home during a bath remodel?+

If it's a guest bath: yes. If it's the only bathroom in the house: usually no, or you'll plan around contractor hours. Primary bath remodels with another working bath in the house are typically fine.

How do you handle waterproofing?+

Sheet membrane (Schluter Kerdi or equivalent) on shower walls and floors, with sealed joints and corners. Code requires a 24-hour flood test before tile. We do it.

Prefer to talk?

We reply same day.

Direct
+1 (858) 667-0800support@meetapx.com
Service area
San Diego County
Orange County
Los Angeles County
Licensed
CSLB #1144953
Architecture, electrical, and plumbing in-house
Call nowGet a quote